OUR WORKS

Case Study

Case Study 16

Affinity carried out the Bid Preparation, Engineering Management, Detailed Design, Client Liaison & Coordination, DCC & Final Documentation for 4 No. Zone II Technical Modules Including Laboratory, Mechanical Workshop, Electrical Workshop & Stores. This project was designed at Affinity Office in Malaysia and eventually completion project managed in Singapore by Affinity Offshore personnel.

Enquest Kraken Technical Modules

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

IMG_7440 IMG_7442 IMG_7443 IMG_7445 IMG_7446 l1 l3 m1 m2 md3