OUR WORKS

Case Study

Case Study 10

Affinity carried out a survey and proposals for the whole of the BP PSVM in Angola at the end of 2017. After some consideration, BP decided to undertake a full renovation of the locker room and toilet areas as the first scope. Affinity’s scope has included survey, proposals, costings, Engineering Management & Coordination, detailed drawings & specifications, 3D visualizations, vendor interface, and production through to completion of the Offshore Workpacks to BP standard & Affinity standards. Installation shall be undertaken 4th Quarter 2020.

BP PSVM 140 POB LQ Refurbishment

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

nx5 nx6 1b 2b d c i4 a e2 i5